Sulzer Turbo Services
Sulzer Corporation Contact Us Sitemap
Sulzer Turbo Services
  You are here: Home  Resource Center  Case Studies
 

Our Locations Worldwide
Our Facilities
Your Local Sales Contact

 
Search Case Studies


Type of Equipment:
Processes:
Industries:



Please click here to show the case studies in HTML

Case Studies
CS_5 Final Stage Blade Modification Extending LIfecycle (pdf, 0.22 MB)
CS_4 Lifetime Extension against Minimum Downtime and Cost (pdf, 0.23 MB)
CS_3 Fast Turnaround for a Fertilizer Plant (pdf, 0.22 MB)
CS_2 Design Changes Resulting in Lifetime Extension of Gas Turbine Rotor Blades (pdf, 0.27 MB)
CS_1 Importance of Startup Vibration Measurements on Turbomachinery (pdf, 0.23 MB)
TT16_Crude Unit Fire Recovery Project (pdf, 0.07 MB)
TT16_160 MW Steam Turbine Repair Project (pdf, 0.27 MB)
TT16_Win-Win Situation for Customer and Sulzer (pdf, 0.26 MB)
TT16_Major Overhaul and Repair of an F-Class Turbine (pdf, 0.51 MB)
TT15_Major Overhaul of a Geothermal Power Plant (pdf, 0.32 MB)
TT15_One Stop Shop in Libya (pdf, 0.38 MB)
TT15_Improving Existing Equipment (pdf, 0.37 MB)
TT14_Repair of a Damaged Journal Bearing on a Generator Rotor (pdf, 0.44 MB)
TT14_Delivering a Cleaner Environment (pdf, 0.28 MB)
TT14_Major Overhaul of Critical Rotating Equipment at a Petrochemical Plant (pdf, 0.2 MB)
TT14_Design Change Takes Care of Repeated Tie Wire Cracking on a 19 MW-Steam Turbine (pdf, 0.29 MB)
TT14_First Maintenance Contract on Rotating Equipment for Sulzer Turbo Services in Algeria (pdf, 0.39 MB)
TT14_Reducing Nitric Acid Plant Downtimes (pdf, 0.45 MB)
TT09_Safety First in the Field (pdf, 0.07 MB)
TT09_Rapid Data Acquisition (pdf, 0.07 MB)
TT09_Prepared to Meet Challenge (pdf, 0.1 MB)
TT09_Measuring Digitizing Techniques (pdf, 0.12 MB)
TT09_Lateral Vibration Measurements (pdf, 0.27 MB)
TT08_Major Overhaul of an LIT (pdf, 0.07 MB)
TT08_Awarded Important Order from Brazil (pdf, 0.09 MB)
TT08_Performance Study of an Eleven-Stage Steam Turbine (pdf, 0.07 MB)
TT08_Gas Turbine Maintenance in the U.S Arctic Region (pdf, 0.09 MB)
TT08_On Site Technical Advisory Services (pdf, 0.08 MB)
TT08_New Manufacture of Heavy Combustor Parts (pdf, 0.06 MB)
TT08_Thermal-Barrier Coatings (pdf, 0.41 MB)
TT07_Laser Technologies Developed by Sulzer Elbar (pdf, 0.06 MB)
TT07_Overhaul of a 28 MW Austrian-Design Steam Turbine (pdf, 0.06 MB)
TT07_Altronic COV-10 Governor Controls (pdf, 0.06 MB)
TT07_Reverse Engineeing and Manufacturing (pdf, 0.06 MB)
TT07_Tilt Pad Bearing Preload (pdf, 0.06 MB)
TT07_Overhaul of a Solar Centaur Gas Turbine (pdf, 0.07 MB)
TT07_Small Steam Turbine Test Stand (pdf, 0.11 MB)
TT07_Centrifugal Compressor Failure in 19 Days Repaired (pdf, 0.18 MB)
TT06_Sulzer Hickham USA Begins F-Technology Repairs (pdf, 0.07 MB)
TT06_Manufacture of Hot Section Capital Parts for 123 MW (pdf, 0.08 MB)
TT06_Extensive Repair of Three 600 MW Steam turbine Rotors (pdf, 0.09 MB)
TT06_Sulzer Enpro Provides Needed Support (pdf, 0.09 MB)
TT06_Major Overhaul of a German-Design 100 MW Gas Turbine (pdf, 0.11 MB)
TT06_Gear Problems in Shortened Life (pdf, 0.22 MB)
TT05_New Air Flow Testing Bench (pdf, 0.07 MB)
TT05_Sulzer Repco Overhauls and Repairs a 150-MW ST (pdf, 0.06 MB)
TT05_Nitric-Acid Plant Expander Refurbishment (pdf, 0.06 MB)
TT05_Upgrading Turbomachinery Control Systems (pdf, 0.07 MB)
TT05_Distributor and Specialist of Lubrication Systems (pdf, 0.06 MB)
TT05_Ukrainian-designed Gas Turbines Overhauled by Sulzer Elbar (pdf, 0.07 MB)
TT05_Overhaul of a 90-MW GT, 55-Ton Gas Turbine Rotor (pdf, 0.3 MB)
TT04_Sulzer Hickham USA Tackles a High Number of Rotating Equipment (pdf, 0.11 MB)
TT04_Manufacturing of High Quality Power Turbine (pdf, 0.06 MB)
TT04_"Magic" Fast Track Compressor Repair at Sulzer Hickham USA (pdf, 0.06 MB)
TT04_Gas Turbine Rotor Manufacturing (pdf, 0.08 MB)
TT04_Repcos Dedication to their Customers "Need for Speed" (pdf, 0.08 MB)
TT04_New Manufacture of Combustion Liners and Transition Pieces (pdf, 0.08 MB)
TT04_Overseas Order from Singapore (pdf, 0.18 MB)
TT03_Full Fledge Steam Turbine Repair and Efficiency Increase Performed (pdf, 0.06 MB)
TT03_Unique Repair of Cast Iron Turbine (pdf, 0.06 MB)
TT03_Receiving a Very Large Number of Equipment (pdf, 0.06 MB)
TT03_Sulzer Hickham and Cheng Power Systems (pdf, 0.05 MB)
TT03_Successful Overhaul of a 110 MW Gas Turbine (pdf, 0.07 MB)
TT03_Sulzer Hickham USA's Emergency Transition Duct Repair (pdf, 0.06 MB)
TT03_Sulzer Repco Fast Track Overhaul of Three Compressor Trains (pdf, 0.12 MB)
TT03_New at TSUSH Steam Turbine and Compressor Blade Manufacturing (pdf, 0.11 MB)
TT02_Repair of Large Combustion-Section Components at Sulzer STS (pdf, 0.06 MB)
TT02_High Quality Laser Weld repair Solutions at Elbar (pdf, 0.1 MB)
TT02_Sulzer STS Rebuild GT10B Gas Turbine (pdf, 0.34 MB)
TT02_LTSA for a Gas Turbine Train Including Control System (pdf, 0.12 MB)
TT02_Gas Turbine Train Including Control System (pdf, 0.05 MB)
TT02_New Development for Disc Changeouts at Hickham Industries (pdf, 0.15 MB)
TT01_Repair of Gas Turbine Components (pdf, 0.25 MB)
TT01_50 MW Steam Turbine Repair (pdf, 0.29 MB)
TT01_Sulzer Repco Turnkey Overhaul on an Axial Compressor Train (pdf, 0.27 MB)
TT01_PT Hickham Indonesia Gas Turbine Overhaul (pdf, 0.3 MB)
TT01_Elbar's Extended Coating Capabilities (pdf, 0.38 MB)
TT12_Repair of a 13.5 MW Steam Turbine and a Compressor (pdf, 0.32 MB)
TT12_Compressor Case Repair (pdf, 0.27 MB)
TT01_Hickham Industries' Emergency Expander Repair (pdf, 0.6 MB)
TT12_On-Site Protective Coating in Malaysia (pdf, 0.13 MB)
TT12_15 Years Maintenance of Critical Rotating and Recip Equipment (pdf, 0.19 MB)
TT12_Major Inspection on a Coal Fired Power Station in EU (pdf, 0.28 MB)
TT11_Upgrading and Repairing Compressors with Dry Gas Seals (pdf, 0.17 MB)
TT11_Extending the Service Life of Single-Crystalline Turbine Blades (pdf, 0.19 MB)
TT11_Steam Erosion The Problem-The Solution (pdf, 0.13 MB)
TT11_Applying HVOF Coating for Blades Erosion Shield (pdf, 0.12 MB)
TT11_Advanced Gas Turbines Repairs (pdf, 0.56 MB)
TT10_Recycling-How to Save Time, Money and Natural Resources (pdf, 0.15 MB)
TT10_Field Services-KEy to Keeping Ammonia Chemical Plants on Line (pdf, 0.15 MB)
TT10_Straightening Repair Work of a 54.3 MW Steam Turbine (pdf, 0.18 MB)
TT10_Rotor Repair by Submerged Arc Welding (pdf, 0.42 MB)
TT10_An Alternative to the OEM for a Frame 3 J Major Overhaul (pdf, 0.34 MB)

Sulzer Turbo Services Difference:
  • Value
  • Time
  • Technology
  • Innovation
  • Relationship

Find out more


Next Steps
Get a Quote
Find out about Training
Go to Resource Center
Sign up for Our E-Newsletter
Ask a Question
Sales Regions